EV Armenia

EV charging cost calculator (Armenia, AMD)

By EV Armenia team · Updated

Short answer

To estimate what a charge costs, multiply the energy you take from the grid by the price per kWh. Energy added equals battery size times the percentage you add; the grid delivers about 10% more because of charging losses. For a 60 kWh battery charged from 20% to 80% at 100 AMD per kWh the bill is about 3,960 AMD, and the car gains about 210 km.

EV charging cost calculator

Enter your battery size and the charge you need. The result updates as you type.

kWh, see the car’s specification
% of the battery
% of the battery
AMD per kWh
% lost as heat; 10 is a common planning assumption, set 0 to ignore
kWh per 100 km, mixed driving; see the car’s data
Energy added to the battery
- kWh
Energy you pay for
- kWh
Cost of the session
- AMD
Range added
- km

An estimate: the real bill depends on the tariff, charging losses, battery temperature and the car’s charging curve. The price field is filled from the EV Armenia catalog and can be changed.

The formula

  1. Energy added = usable battery capacity x (target % - current %) / 100.
  2. Energy you pay for = energy added x (1 + losses / 100). Losses are the share lost as heat in the charger and car; 10% is a common planning assumption.
  3. Cost = energy you pay for x price per kWh.
  4. Range added = energy added / consumption per 100 km x 100.

A worked example

Charging a 60 kWh battery from 20% to 80%
StepValue
Energy added60 x 60 / 100 = 36 kWh
Energy you pay for36 x 1.10 = 39.6 kWh
Cost at 100 AMD per kWh39.6 x 100 = about 3,960 AMD
Range added at 17 kWh per 100 km36 / 17 x 100 = about 212 km

These values are an example, not a forecast. Your battery, consumption and losses differ.

Scroll sideways to see the whole table

Where to find your numbers

  • Usable battery capacity is in the car’s specification. It is usually lower than the headline figure.
  • Consumption is in the car’s trip computer; winter and highway driving raise it.
  • Price per kWh: the EV Armenia network charges 100 AMD for AC. Home electricity costs 44.98 AMD by day and 34.98 AMD at night in 2026; see home charging. Other networks are in charging prices.

Why charging above 80% is slower

Most cars slow down as the battery fills, especially on fast chargers, so the last 20% takes disproportionately long. On AC chargers like ours the power is set by the station and the car’s on-board charger, so time is roughly the energy added divided by the power. For a 36 kWh addition at 7 kW, expect around 5 hours; check the actual power on the station page.

Ready to charge? Open the app to see the price card before you start.

Questions and answers

How much does it cost to fully charge an EV in Armenia?

Multiply the battery size by the price per kWh and add about 10% for losses. For a 60 kWh battery at 100 AMD per kWh, 0 to 100% is about 6,600 AMD.

Why is the real bill different?

Tariffs, losses, battery temperature and the car’s charging curve all vary. The calculator is an estimate.

Does the calculator send my data anywhere?

No. It runs in your browser and sends nothing.

Ready to charge?

Open the map, pick a charger and see the price before you start. No account needed.

Related pages